These two week our team has been building our base for our project. We had run into issues such as the parts being too short or too long. Other issues include the holes we drilled not being in the right spot that we had hope for. We were also notified that our base may have a defect due to the size we were using. After our team had a talk about it, we finally decided to refit our base. Our next job after fixing the base, is to add the gantry, plates, and spindle onto the base.

 