Wireless Network Expansion Tech Briefing—October 2013

Note: This article was originally published on our website in October 2013 and is being added to this blog for historical purposes.

Campus Housing

We are installing cabling and network switches in Campus Village for Wireless Access Points.

Main Campus

We converted the Music building, Faculty Offices and Administration to Cisco Wireless. UPD and SSC are scheduled to be converted to Cisco Wireless in October. We are installing access points in the Student Union in preparation for opening. The cabling work for additional access points in buildings is 75% complete.

King Library

Ongoing tuning to existing WAPs to optimize performance. We added 8 WAPs.

Off Campus

Bunker Hill is complete.