Roadway to Final Delivery Part 2

The team has been working non-stop to finalize the assembly of the project. As seen in Figure 1, the base is completely finished, the shelving system constructed with 80/20 is also completely finished, and the bed plants also came in. Fish Tank decorations have also been purchased. The next steps for the project include setting up the drain and water system and installing the system at the Tech Museum of Innovation.

Figure 1. Aquaponics System

As for the IoT system, there seem to be difficulties setting up the pH sensor. Other than that, everything else is ready for final integration and set up.